Final sculpting on American Beauty

I'm at the stage in sculpting "American Beauty" that I pretty much have to do all the work myself.  Jose Rodriguez has gone back to Austin after six weeks or so up here in the studio.  The last couple of days I've spent refining the hair and should be done tomorrow. Next up, arms & shoulders. I've thrown in a few shots of other sculptures hanging around the studio.

A double life sized Pastoral Dreamer was delivered to the Tom Ross Gallery in Santa Fe last Saturday by Deep in the Heart Foundry and was set in place by crane man extraordinaire Roger Lamoreux.

Today I'm teaching Christie Owen to mig-weld and I'm finding that she's a natural born welder.

David L Phelps


American Beauty



Christie Owen arrives

practice welds


Big skull



1.5 X life size Pastoral Dreamer
Christie Hackler for scale reference

Life size American Beauty

Watership Down on a 5000 lb steel pedistal

Party

David Tamez of Public TV Station OETA brought his crew in last night for  final shooting for the Gallery program he's producing about my work. He shot at night so he could have total control over the lighting without any daylight coming through the skylights.

Yesterday morning I got a message from Cynthia Rodriguez saying "you stole my husband and I'm driving up tomorrow and taking him back home." Cynthia & Jose had come up from Austin to go to a niece's wedding in Norman two months ago; Jose decided he'd help me in the studio for a few days and he's still here. But no more, I'm losing him today. Cynthia and their kids Isabella & Gabriel should arrive this afternoon to see why Jose disappeared for two months. Then they'll kidnap Jose and take him back to Austin. It's been a great, productive two months of work on American Beauty and she's almost ready for the foundry.

David L Phelps

Boots filming

David Tamez, Myself, Boots

Ryan setting up lighting

Dave Tamez setting up camera


Camera dolly





Mice in the foreground

Skull in the foreground

part of the filming









The End is Near

Tuesday  August 7th 2012

We're getting close to completion with "American Beauty."

It feels so good to be so close. Four of us cleaned and organized the studio today, we can see the light at the end of the tunnel. Tomorrow we unify the color in anticipation of the final push to being ready for mold making. Time for a celebration. I foresee a big letdown when "American Beauty" heads off to the foundry. It will be a time of catching up on all the tasks that have been put off in order to get this piece finished. Tomorrow's my parents anniversary; they're off on a much needed adventure at Pismo Beach. I'm ready for an adventure myself. Will probably have to wait until Thanksgiving when Patty, Me,  Sarah and Mike go to Sedona  to Garlands' Lodge for giving thanks for family and happiness.


David L Phelps





















Fridays work on "American Beauty" with Jose Rodriguez

Friday morning I finished sculpting the second foot ( other than overall surface smoothing). Jose continued work on the hair. I built a platform that allows me to get up close to the face without being bent over ( I need to protect my back). I made good progress on the nose with a little more to go. This morning I'll finish the nose and move on to the eyes and mouth. Looks like another long day today.

David L Phelps
sacrificing the knees to save the back



Add caption


believe it or not, the white model is life size



American Beauty on Friday

I got a lot of sculpting done on the right foot today and Jose continued making great progress on the hair.

A couple of days ago we had all seven toilets in the building overflow at once. This is day two of the plumbing crew. They had a camera down the pipe and now have 90 feet of snake down the hole but haven't found the problem yet. Yikes. 

The good news is that all the toilets are being completely rebuilt. Shouldn't have to worry about them for a while.









Hi Patsy!!!





Continued sculpting on "American Beauty"

Busy day today: made another double batch of oil-clay,  Jose Rodriguez,  Christie Hackler &
Christie Owen were all in working, Hackler left to do a news spot with Linda Cavanaugh of KFOR-TV about the upcoming Fringe opening this Friday and Dave Tamez from OETA came back to shoot more footage for the Gallery segment that will air this fall.


David L Phelps
Jose Rodriguez,  Christie Hackler & Christie Owen

Jose Rodriguez,  Christie Hackler & Christie Owen

the Bad Boy oil-clay maker eying his new batch

Monday's progress on "American Beauty"

Today Jose & I sculpted hair & ears; made great progress. Over the weekend,  we added a layer of clay over the entire form to unify the color thus making it much easier to understand the form we're sculpting. Tomorrow will be more sculpting of the form as well as smoothing the overall surface with flexible steel ribs.





Work is progressing well on American Beauty. Jose Rodriguez is up from Austin offering invaluable help in getting this piece finished with the attention to detail that I'm looking to achieve. I'm also getting great help from Christie Hackler and Christie Owen.
American Beauty

Red Head bad boy put back into service today
to make another 160 lbs of oil clay

Jose Rodriguez working on the hair

Jose Rodriguez working on the hair

Going over mig welding theory with Christie Owen

Christie admiring the pattern

Cutting steel panels with the plasma cutter

Cutting steel panels with the plasma cutter

Going over process

Christie cleaning up the panels with the Dewalt

Getting that steel sliver out

Inspection

Demonstrating interior welding

Sunday studio work


Working on Sunday with Christie Owen and Jose Rodriguez.  Sculpting on American Beauty and getting some pieces patinated to ship out to Whistler Village Art Gallery and to a private collector.




sandblasting

 heating up the Oarsman
patina notes and chemicals








Spraying Lacquer

finished "Dive"

finished "Oarsman"